PROJECT DESCRIPTION:

The 8th Street Optimisation Project is meant to upgrade the loading and offloading capacity of the TOTAL Uganda Ltd. depot. The works include demolitions, civil works, extension of loading facilities, construction and automation of a new gantry, structural steel works, piping works, electrical & instrumentation works and improvement of truck circulation area.

PROJECT DETAILS:

  • Category: Earth Works, Steel Works,             Piping Works & Electrical Works.
  • Client: Total Uganda Ltd.
  • Location: 8th Street Industrial Area,             Kampala, Uganda.
  • Date: January 2019 to June 2021
  • Duration: 30 Months
  • Project Value: $3.1m
  • Personnel: Circa 40
  • Status: 99% Completed

PROJECT SCOPE:

  • Earthworks
  • 1000m3 concrete.
  • Engineering and aero survey
  • 3000m length of piping works
  • 32.6T Structural Steel works
  • Mechanical Installations
  • Electrical and Instrumentation Works