Total Project

THE CHALLENGES

Understanding your manpower and cash issues can determine the success or failure of any project. Do not overestimate your capabilities or underestimate your cash flow.  Map out the details of all of the projects going on and what you are bidding that could happen in the near future.Inflexibility is another challenges. Map out your plan and continually review your plan versus reality. Be willing to make changes when you see your plan is failing. Without a plan or refusing to gauge success against your plan has doomed many companies to continue down a road to failure. Have a willingness to change the plan and learn. Failing teaches you a lot.

IMG_0921_

PROJECT DETAILS

Categories:
Client: Total Uganda Limited
Surface Area: 1000m3 Concrete
Completed: 20019 To Date
Value: $3.97m
Architect: Circa 40
IMG_0688_

PROJECT DETAILS

The 8th Street Optimisation Project involves upgrading of loading and offloading capacity of the TOTAL Uganda Ltd. depot which and this includes demolition, extension of loading facilities, construction and automation of new gantry. Structural steel works, Piping, electrical works, instrumentation works and improvement of truck circulation area.

IMG_0849_

OUR CLIENTS SAYS

The guys at Civtec did an amazing job. They’re an awesome team to work with.

I’ve been happy with the services provided by Civtec Africa. They have been wonderful; the project manager has always returned my calls quickly, and he answered all my questions.

If you find a high quality constructor for your project?